Three systems, visible assumptions.
Replace every fictional dimension and specification with controlled model data and revision dates.
Extended living
Courtyard pair
Factory work is one part of delivery.
Timing depends on design, engineering, permissions, site access, utilities, transport, inspections and finishes.
Scope
Site, budget, model fit and exclusions.
Design
Options, engineering and approvals.
Prepare
Foundation, access and utilities.
Fabricate
Controlled factory stages and checks.
Set
Transport, crane, weather and connections.
Handover
Inspection, records, defects and warranty.
Read the plan with scale and revision.
Concept diagram only—no scale. Replace with accurate accessible plan files and key dimensions.
Materials with performance context.
Claims require system build-up, test method, conditions, scope and current certification.
Cedar rainscreen*
Species, grade, treatment, fixing and maintenance to be confirmed.
Metal roof*
Profile, coating, underlay, drainage and warranty conditions.
Wall system*
Structure, insulation, membranes and tested assembly.
Window system*
Frame, glazing, installation, climate and performance values.
Before the factory slot.
Do not treat this checklist as planning, engineering or construction approval.
Ownership, easements and applicable restrictions.Verify
Jurisdiction, use, setbacks and required approvals.Verify
Route, turning, overhead limits and setup area.Verify
Survey, geotechnical, foundation and utility scope.Verify
Show what the range excludes.
All values are fictional. Publish currency, date, location, scope, contingency and quote validity.
